Pay in installments of $13.07 with
,
and
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 24 - Jul 29
For Your Every Summer RSVP, with Code: SUMMER15
Description
LC1DT20D7Main Range TeSys Product name TeSys D Product or component type Contactor Device short name LC1D Contactor application Resistive load Utilisation category AC 1 Poles description 4P Power pole contact composition 4 NO [Ue] rated operational voltage Power circuit: <= 690 V AC 25 400 Hz Power circuit: <= 300 V DC [Ie] rated operational current 20 A (at <60 C) at <= 440 V AC AC 1 for power circuit Control circuit type AC at 50 60 Hz [Uc] control circuit
Main
| Range | TeSys |
| Product name | TeSys D |
| Product or component type | Contactor |
| Device short name | LC1D |
| Contactor application | Resistive load |
| Utilisation category | AC-1 |
| Poles description | 4P |
| Power pole contact composition | 4 NO |
| [Ue] rated operational voltage | Power circuit: <= 690 V AC 25...400 Hz Power circuit: <= 300 V DC |
| [Ie] rated operational current | 20 A (at <60 °C) at <= 440 V AC AC-1 for power circuit |
| Control circuit type | AC at 50/60 Hz |
| [Uc] control circuit voltage | 42 V AC 50/60 Hz |
| Auxiliary contact composition | 1 NO + 1 NC |
| [Uimp] rated impulse withstand voltage | 6 kV conforming to IEC 60947 |
| Overvoltage category | III |
| [Ith] conventional free air thermal current | 10 A (at 60 °C) for signalling circuit 20 A (at 60 °C) for power circuit |
| Irms rated making capacity | 140 A AC for signalling circuit conforming to IEC 60947-5-1 250 A DC for signalling circuit conforming to IEC 60947-5-1 250 A at 440 V for power circuit conforming to IEC 60947 |
| Rated breaking capacity | 250 A at 440 V for power circuit conforming to IEC 60947 |
| [Icw] rated short-time withstand current | 30 A 40 °C - 10 min for power circuit 61 A 40 °C - 1 min for power circuit 105 A 40 °C - 10 s for power circuit 210 A 40 °C - 1 s for power circuit 100 A - 1 s for signalling circuit 120 A - 500 ms for signalling circuit 140 A - 100 ms for signalling circuit |
| Associated fuse rating | 10 A gG for signalling circuit conforming to IEC 60947-5-1 25 A gG at <= 690 V coordination type 1 for power circuit 20 A gG at <= 690 V coordination type 2 for power circuit |
| Average impedance | 2.5 mOhm - Ith 20 A 50 Hz for power circuit |
| [Ui] rated insulation voltage | Power circuit: 600 V CSA certified Power circuit: 600 V UL certified Signalling circuit: 690 V conforming to IEC 60947-1 Signalling circuit: 600 V CSA certified Signalling circuit: 600 V UL certified Power circuit: 690 V conforming to IEC 60947-4-1 |
| Power dissipation per pole | 1.56 W AC-1 |
| Safety cover | With |
| Mounting support | Plate Rail |
| Standards | CSA C22.2 No 14 EN 60947-4-1 EN 60947-5-1 IEC 60947-4-1 IEC 60947-5-1 UL 508 |
| Product certifications | UL RINA BV GOST CCC DNV CSA GL LROS (Lloyds register of shipping) |
| Connections - terminals | Control circuit: screw clamp terminals 2 cable(s) 1…2.5 mm²flexible with cable end Control circuit: screw clamp terminals 1 cable(s) 1…4 mm²flexible without cable end Control circuit: screw clamp terminals 2 cable(s) 1…4 mm²flexible without cable end Control circuit: screw clamp terminals 1 cable(s) 1…4 mm²flexible with cable end Control circuit: screw clamp terminals 1 cable(s) 1…4 mm²solid without cable end Control circuit: screw clamp terminals 2 cable(s) 1…4 mm²solid without cable end Power circuit: screw clamp terminals 1 cable(s) 1…4 mm²flexible without cable end Power circuit: screw clamp terminals 2 cable(s) 1…4 mm²flexible without cable end Power circuit: screw clamp terminals 1 cable(s) 1…4 mm²flexible with cable end Power circuit: screw clamp terminals 2 cable(s) 1…2.5 mm²flexible with cable end Power circuit: screw clamp terminals 1 cable(s) 1…4 mm²solid without cable end Power circuit: screw clamp terminals 2 cable(s) 1…4 mm²solid without cable end |
| Tightening torque | Control circuit: 1.7 N.m - on screw clamp terminals - with screwdriver flat √ò 6 mm Control circuit: 1.7 N.m - on screw clamp terminals - with screwdriver Philips No 2 Power circuit: 1.7 N.m - on screw clamp terminals - with screwdriver flat √ò 6 mm Power circuit: 1.7 N.m - on screw clamp terminals - with screwdriver Philips No 2 |
| Operating time | 4...19 ms opening 12...22 ms closing |
| Safety reliability level | B10d = 1369863 cycles contactor with nominal load conforming to EN/ISO 13849-1 B10d = 20000000 cycles contactor with mechanical load conforming to EN/ISO 13849-1 |
| Mechanical durability | 15 Mcycles |
| Maximum operating rate | 3600 cyc/h 60 °C |
Complementary
| Coil technology | Without built-in suppressor module |
| Control circuit voltage limits | Drop-out: 0.3...0.6 Uc AC 50/60 Hz (at 60 °C) Operational: 0.8...1.1 Uc AC 50 Hz (at 60 °C) Operational: 0.85...1.1 Uc AC 60 Hz (at 60 °C) |
| Inrush power in VA | 70 VA 60 Hz cos phi 0.75 (at 20 °C) 70 VA 50 Hz cos phi 0.75 (at 20 °C) |
| Hold-in power consumption in VA | 7.5 VA 60 Hz cos phi 0.3 (at 20 °C) 7 VA 50 Hz cos phi 0.3 (at 20 °C) |
| Heat dissipation | 2…3 W at 50/60 Hz |
| Auxiliary contacts type | Type mechanically linked 1 NO + 1 NC conforming to IEC 60947-5-1 Type mirror contact 1 NC conforming to IEC 60947-4-1 |
| Signalling circuit frequency | 25...400 Hz |
| Minimum switching current | 5 mA for signalling circuit |
| Minimum switching voltage | 17 V for signalling circuit |
| Non-overlap time | 1.5 ms on de-energisation between NC and NO contact 1.5 ms on energisation between NC and NO contact |
| Insulation resistance | > 10 MOhm for signalling circuit |
Environment
| IP degree of protection | IP20 front face conforming to IEC 60529 |
| Protective treatment | TH conforming to IEC 60068-2-30 |
| Pollution degree | 3 |
| Ambient air temperature for operation | -5…60 °C |
| Ambient air temperature for storage | -60…80 °C |
| Permissible ambient air temperature around the device | -40…70 °C at Uc |
| Operating altitude | 3000 m without |
| Fire resistance | 850 °C conforming to IEC 60695-2-1 |
| Flame retardance | V1 conforming to UL 94 |
| Mechanical robustness | Vibrations contactor open: 2 Gn, 5...300 Hz Vibrations contactor closed: 4 Gn, 5...300 Hz Shocks contactor closed: 15 Gn for 11 ms Shocks contactor open: 10 Gn for 11 ms |
| Height | 85 mm |
| Width | 45 mm |
| Depth | 92 mm |
| Net weight | 0.365 kg |
Offer Sustainability
| Sustainable offer status | Green Premium product |
| REACh Regulation | REACh Declaration |
| REACh free of SVHC | Yes |
| EU RoHS Directive | Under investigation |
| Toxic heavy metal free | Yes |
| Mercury free | Yes |
| RoHS exemption information | Yes |
| China RoHS Regulation | China RoHS declaration |
| Environmental Disclosure | Product Environmental Profile |
| Circularity Profile | End of Life Information |
| WEEE | The product must be disposed on European Union markets following specific waste collection and never end up in rubbish bins |
Contractual warranty
| Warranty | 18 months |
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
4.7 ★★★★★
Based on 11 reviews
Sort
Product Reviews
★★★★★ 5
Great book
Format: Paperback
Very great book. Came quicker than expected. Very great condition!!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on February 20, 2023
★★★★★ 5
One of the best Project Management Books I've Read!
Format: Kindle
This was a really great read for many reasons. The focus on ensuring your project has a strategic purpose is so important these days, where Program and Project Managers need to make sure the projects they are leading are providing value to the organization. The framework is one that can be applied immediately with the explanation and tools provided in the book and on the author's website. The real-life stories and projects were not only fun to read, but very helpful in understanding how to apply the framework. The examples were very thorough and helpful. There is great information on what is needed from a PM to be successful including managing the team and stakeholders.
On top of all that, when I got to Chapter 10 it was like a bonus chapter for me. Chapter 10's focus is on "managing your inner game", and has great information on ensuring you have the right mindset to be successful. Project Managers have the opportunity (and challenge) to work with many different personalities and in many challenging environments. This chapter provides really great information on how to navigate those waters and be successful. Chapter 10 could seriously be a book in itself.
Chapter 12 was yet another bonus chapter, especially for lifelong learners. It's all about the idea of taking everything we've learned and applying it to our life. As the author states, our lives are essentially a project. Why not apply the same principles to ensure we are achieving our purpose and providing value, with yet again, really great examples to get us started.
Anyone who leads or is involved in any kind of projects or who wants to work better in a team environment would benefit from reading this book.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 5, 2021
★★★★★ 5
Strategic Management Made Simple and Effective
Format: Hardcover
I told Terry Schmidt that would be a better title for his book, “Strategic Management Made Simple and Effective”.
The time-tested Logical Framework Approach (LFA) that Terry champions goes far beyond project management. With its exploratory LogFrame matrix leading from inputs to outcomes, outcomes to purpose, and purpose to goal, the LFA forces you to understand the reason for the project. Projects are not executed for their own reason but to achieve something specific. The LogFrame traverses the ladder from inputs to goal through objectives with success measures, ways to verify success, and assumptions that must hold true be successful.
Terry adds his own concept -- that he calls the Implementation Equation™ -- to help you build the LogFrame: IF inputs AND valid assumptions, THEN outcomes / IF outcomes AND valid assumptions, THEN purpose / IF purpose AND valid assumptions, THEN goal.
This methodology offers you a way to view the LogFrame with multiple perspectives: scientific method, strategic planning, project management, risk management, management by objectives, and, although he does not mention it, also quality management.
In particular, his use of assumptions has helped me to redefine my view of risk management. Rather than brainstorm a large list of possible risks in a registry that becomes impossible to manage, I use the probability that the assumptions needed for success are not valid – and their impact on achieving success, as the true risks that must be actively managed.
A highly entertaining as well as informative book, “Strategic Project Management Made Simple”, or whatever you choose to call it, should be the first guide you reach for when building a portfolio, creating programs or products, or starting a project.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on November 5, 2021
★★★★★ 5
Easy to Learn Concepts & Great Read
Format: Hardcover
This book is perfect for those curious problem solvers looking to solve simple and complex situations with achievable solutions. The additional resources that come with the book are incredibly helpful in reviewing the multitude of case studies shared. Further, the author provides easy to follow guidance on how to apply the log frame to any situation and shares common pitfalls to avoid. Anyone looking to better understand and implement strategic project planning easily, buy this book!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on June 27, 2023
★★★★★ 5
LFA is now the Project Manager's Super-Power!
Format: Hardcover, Format: Hardcover
This books is not just for PMs, it is also for people in operations that are facing the challenge of aligning the output of their day-to-day activities and multiple projects with the bigger picture of their enterprise.
Personally, what I liked the most (and which it has been very helpful) is the visualization and alignment of the strategy with the operational side of the business: Logical Framework Approach (LFA) -- I call LFA my hidden super-power!
Strategy is an abstract concept and often difficult to communicate to those responsible for the execution of the projects. Terry made this task very simple by addressing the most important aspect of any project: What are we trying to accomplish and Why?
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 16, 2022